In this job we stripped out the original tiles, fittings and fixtures and replaced everything, with a higher standard of materials and finish, in the same layout and arrangement.We re-tiled all the walls and floor with a 15mm porcelain backed marble tile. We used a mitre cut tile-to-tile finish, instead of trim, throughout, except on the step leading into the bathroom.
Services provided included plumbing, plastering, tiling, electrical, carpentry and painting.